Home

Go Big With Your Show

Projects Permanent installation

Mall of Sofia · Advance Business Center · Sofia Tower

The screen at Mall of Sofia - and three more for the same owner.

160 m² P4 · 2 × 70 m² P3 · 32 m² P2 · 332 m² in total · since 2018

P3 LED wall in the lobby of Advance Business Center
Advance Business Center - P3 LED wall in the lobby. The building is a “Building of the Year” winner; the screen is part of how it welcomes people.

Screens for a mall, for the two receptions of a business building and for an office tower - one owner, all installed in 2018.

Our part was the design, the structure, installation, set-up, training for the on-site team - and maintenance ever since. 160 m² P4 at Mall of Sofia · 70 m² P3 at each of the two receptions of Advance Business Center, 140 m² in total · 32 m² P2 at Sofia Tower. 332 m² in total.

Walk through Mall of Sofia or into the lobby of Advance Business Center - the screens have been running since 2018. Four screens, one owner.

“We started with KVANT more than 8 years ago. Today they are behind 160 m² of P4 at Mall of Sofia, 70 m² at each of the two receptions of Advance Business Center and another 32 m² at Sofia Tower - over 330 m² in total. You don’t order a second and a third site from a supplier who let you down on the first.”

Danny BercovichMall of Sofia / Advance Business Center / Sofia Tower

Danny Bercovich, owner of the three buildings.

In numbers

Sites
Mall of Sofia, Advance Business Center (both receptions), Sofia Tower
Owner
one, four screens
Year
2018, all of them
Mall of Sofia
160 m², pitch P4
Advance Business Center
2 × 70 m², pitch P3
Sofia Tower
32 m², pitch P2
Total
332 m²
Our part
design, structure, installation, set-up, training for the on-site team and maintenance ever since

How the work went

A permanent installation is different work from a rental. The screen does not come down after three days; it runs every day for years, and every decision on the structure, the power supply and service access is paid for or saved over that whole period. In the mall, the screen is part of the architecture of the space and is viewed from a distance, so the pitch is P4. In the Advance Business Center lobbies, people pass a few metres from the wall and the pitch is finer, P3. At Sofia Tower, P2 is for the closest viewing.

All four screens were installed in the same year, with on-site training for the people there on how to change the content, and with maintenance ever since. Walk through Mall of Sofia or into the lobby of Advance Business Center: the screens have been running since 2018.

For a similar project

When you buy a screen for a mall, a lobby or a shop window, the first question is from how many metres people will watch it: the distance gives the pitch, and the pitch and the area give the price. We sell the screen complete: structure, installation, set-up, training and a 50-month warranty. The calculator gives a price for a specific size; which pixel pitch suits which distance is explained on the LED screens for sale page, and shop windows and lobbies are on the indoor LED screens page.

Video

Mall of Sofia.

Advance Business Center.